Overview

TREKKA was contracted to deliver essential non-process infrastructure at Castle Hill. This included offices and ablutions, reinforced concrete workshop pads, wash bay, site paths, shelter and associated civil works.

Key Deliverables
  • Installation of 18 modular buildings, verandahs and paths
  • Full service electrical plumbing, water and waste
  • Design, permits, certification and engineering
  • 4 x Reinforced concrete workshop pads (150–200mm thick) including HV bay with rails
  • 300mm thick Tyre Bay pad with edge thickening
  • 74m x 2m apron with soak well integration
  • Full project management, safety systems, and engineering compliance
  • HV Wash Bay
Outcome

RGWA delivered the scope efficiently and to specification, enhancing the operational readiness of Castle Hill’s mine support infrastructure.

Projects

Including pre-feasibility concepts, full design and documentation, sourcing of infrastructure, throughout construction and beyond, TREKKA will be with you every step of the way.