Core Project Scope
  • 14 SPQ units installed across two stages (7 per stage)
  • Gym (12m x 6m), Laundry (12m x 3m), Ablutions and shower blocks
  • Full utility reticulation (plumbing, electrical, comms, AC)
  • Verandahs, concrete paths, breezeways, and culverts
  • Site-wide cleaning, waste removal, and final handover
  • Design, engineering, permits, commissioning, testing, and compliance certification
Stage 1 Highlights
  • 7 SPQs installed with full services
  • Gym and laundry buildings installed
  • Verandahs and paths constructed
Stage 2 Highlights
  • 7 SPQs installed alongside Stage 1
  • Ablutions and shower blocks.
  • Security upgrades
  • Power upgrades
  • Breezeways and access infrastructure added
  • Builders clean and compliance certifications
Additional Scope of Works
  • Room security latches installed in 276 rooms
  • Automated sliding gates added at North and South entries
  • Kitchen grease trap system upgraded
  • Power upgrade with 2 x genset, concrete plinths changeover switch and associated infrastructure
  • General infrastructure works: concrete, utilities, and certifications