Core Project Scope
  • Demolition and removal of existing derelict infrastructure
  • Relocation and reinstallation of existing accommodation
  • Supply and Installation of 5 x SPQ units (4-bed, 4-ensuite configuration)
  • Plumbing and electrical works including sewer and potable water tie-ins and upgrades as required
  • Breezeways, concrete access paths, ramps, and final building placement
  • Design, engineering, permits, commissioning, testing, and compliance certification
Additional Scope of Works
  • Electric fencing, auto gates and screen walls installed around sensitive infrastructure
  • Upgrades to plumbing systems and reticulation ring main
  • General carpentry and electrical works across village infrastructure

Projects

Including pre-feasibility concepts, full design and documentation, sourcing of infrastructure, throughout construction and beyond, TREKKA will be with you every step of the way.