Core Project Scope
  • 14 SPQ units installed across two stages (7 per stage)
  • Gym (12m x 6m), Laundry (12m x 3m), Ablutions and shower blocks
  • Full utility reticulation (plumbing, electrical, comms, AC)
  • Verandahs, concrete paths, breezeways, and culverts
  • Site-wide cleaning, waste removal, and final handover
  • Design, engineering, permits, commissioning, testing, and compliance certification
Trades installing precast concrete footings for transportable building foundations at a regional Western Australian site.
Stage 1 Highlights
  • 7 SPQs installed with full services
  • Gym and laundry buildings installed
  • Verandahs and paths constructed
Stage 2 Highlights
  • 7 SPQs installed alongside Stage 1
  • Ablutions and shower blocks.
  • Security upgrades
  • Power upgrades
  • Breezeways and access infrastructure added
  • Builders clean and compliance certifications
Additional Scope of Works
  • Room security latches installed in 276 rooms
  • Automated sliding gates added at North and South entries
  • Kitchen grease trap system upgraded
  • Power upgrade with 2 x genset, concrete plinths changeover switch and associated infrastructure
  • General infrastructure works: concrete, utilities, and certifications
Transportable service building on concrete piers with external fire hose reel at a regional Western Australian site.

Projects

  • Aerial view of completed modular accommodation camp arranged in circular layout in remote Western Australia.
  • Castle Hill project transportable buildings and concrete pathways installed in regional Western Australia
  • Row of transportable accommodation units with external plumbing services installed at a regional Western Australian site.

Including pre-feasibility concepts, full design and documentation, sourcing of infrastructure, throughout construction and beyond, TREKKA will be with you every step of the way.